Please see this coming week's traffic restrictions below
. For more information on these projects or any other construction projects in Palm Beach County, log on towww.pbfdot.com.
For up-to-the-minute traffic information call 511.
I-95 HOV Expansion, from Donald Ross Road (exit 83) north to S.R. 706/ Indiantown Road (exit 87A/B)
The
$43.5 million, 4.5-mile construction projectwill expand the existing six-lane interstate to 10 lanes, which includes one general-purpose lane and one High Occupancy Vehicle (HOV) lane in each direction and additional auxiliary lanes. The project includes widening of the existing bridges over Donald Ross Road and the C-18 Canal; ramp improvements; sound barrier and retaining wall construction; signalization enhancements; new signing, pavement markings, lighting; and landscaping, including irrigation. The work began
August 21, 2008 is being performed by
Posen Construction. Construction is expected to be
completed spring 2012.
Restrictions: The inside and outside travel lanes of northbound and southbound I-95 will be closed, 9 p.m. until 6 a.m., Sunday, October 4, through Thursday, October 8, for barrier wall relocation.
The outside travel lane of eastbound Donald Ross Road will be closed, 8 a.m. until 4 p.m., Monday, October 5, through Friday, October 9.
Motorists should be aware of construction vehicles entering and exiting the roadway by all Donald Ross Road entrance and exit ramps and the median area just north of Donald Ross Road. The inside left turn lane, of two lanes from westbound Donald Ross Road onto southbound I-95 is closed. The inside eastbound lane of Donald Ross Road under the I-95 overpass is also closed. The advisory speed limit is posted at 25 mph on all the Donald Ross Road entrance and exit ramps. Please use caution.
I-95 HOV Expansion, from south of PGA Boulevard (exit 79A/B) north to Donald Ross Road (exit 83)
The
$44 million, 4.3-mile construction projectwill expand the existing six-lane interstate to 10 lanes, which includes one general-purpose lane and one High Occupancy Vehicle (HOV) lane in each direction and additional auxiliary lanes. The project includes mainline ramp reconstruction and the widening of the existing bridges over PGA Boulevard and Military Trail (exit 79C). Additional enhancements include improved drainage; sound barrier and retaining wall construction; new signing, pavement markings, lighting, and landscaping. Construction
began August 20, 2008 and is being performed by
Community Asphalt Corporation. This project is expected to be
completed winter 2011.
Restrictions: There will be intermittent closures to two inside and / or outside travel lanes on northbound and southbound Military Trail, near the I-95 overpass, intermittently, Saturday, October 3, through Friday, October 9, for bridge widening.
There are now stop signs at the northbound I-95 exit ramp onto westbound PGA Boulevard and at the southbound I-95 exit ramp onto Military Trail. These lanes no longer merge. Advance warning signs are in place on the ramps to alert motorists.
U.S. 1/S.R. 5 Drainage Improvement Project
This
0.18-mile drainage improvement project in the City of Palm Beach Gardens began on
January 12, 2009. This project includes installing new storm water drainage outside of the roadway; repaving; utility work and the installation of French drainage. This project will be constructed in phases to minimize impacts to the public. Phase Four began on Wednesday, September 2 and includes; median and roadway repairs, final paving operations, project clean-up, roadway striping, and final inspection and walk through. This
$2.19 million project is being performed by
Ranger Construction Industries and is expected to be completed
October 2009.
Restrictions:There may be intermittent closures on northbound and southbound U.S. 1, 8 a.m. until 4 p.m., while the contractor completes various punch-list items to prepare for Final Acceptance from the Florida Department of Transportation.
This project is nearing completion.
Alicia M. De Fago
Public Information Officer - Northern I-95 HOV Expansion Projects
11641 Kew Gardens Avenue, Suite 101
Palm Beach Gardens, FL 33410
(561) 718-4709
95info@pbfdot.com
www.pbfdot.com/95Expansion